Last edited by Taukree
Sunday, August 2, 2020 | History

2 edition of Final report of research on wastewater reclamation at Whittier Narrows found in the catalog.

Final report of research on wastewater reclamation at Whittier Narrows

Francis Clay McMichael

Final report of research on wastewater reclamation at Whittier Narrows

by Francis Clay McMichael

  • 338 Want to read
  • 17 Currently reading

Published by W. M. Keck Laboratory of Environmental Health Engineering, California Institute of Technology in Pasadena .
Written in English

    Places:
  • California.
    • Subjects:
    • Water reuse -- California.

    • Edition Notes

      Statementby Francis Clay McMichael and Jack Edward McKee.
      ContributionsMcKee, Jack Edward, joint author., Keck (W. M.) Laboratory of Environmental Health Engineering., California. State Water Quality Control Board.
      Classifications
      LC ClassificationsTD429 .M3
      The Physical Object
      Pagination1 v. (various pagings)
      ID Numbers
      Open LibraryOL6010825M
      LC Control Number66065402

      Whittier Narrows Dam is a foot (17 m) tall earth dam on the San Gabriel River and the smaller, parallel Rio dam is located, as the name implies, at the Whittier provides water conservation storage and is also the central element of the Los Angeles County Drainage Area (LACDA) flood control system.   Reclaimed wastewater frees up fresh water that can be used somewhere else, such as for drinking water California is a good place to go to see how reclaimed wastewater is being used. The East Bay Municipal Utility District has a working water reclamation project that .

      The next three chapters cover the economics, monitoring (sampling and analysis), and legal aspects of wastewater reclamation and practical handbook also presents real-world case studies, as well as sources of information for research, potential sources for research funds, and information on current research projects.   Whittier Narrows Dam repairs should be highest priority for Army Corps, says Rep. Grace Napolitano: “ Rep. Grace Napolitano, a Democrat with a district office in El Monte, sent a letter Wednesday, Feb. 20, urging the U.S. Army Corps of Engineers to make safety repairs at Whittier Narrows Dam its highest budgetary priority in light of an.

      Flood Hazards. My work, in collaboration with USACE staff, HEC, Reclamation staff, and others, focuses on understanding and estimating extreme flood hazards for critical infrastructure such as dams and nuclear reactors.I provide some summary concepts, notes on ongoing efforts, reports, and presentation on this page for several key areas. In addition, a series of upstream water reclamation plants in Whittier, Pomona, Long Beach, Cerritos and Whittier Narrows remove and cleanse huge quantities of sewage for reuse by industry.


Share this book
You might also like
Health accounting for quality assurance

Health accounting for quality assurance

U.S. mining and mineral-processing industry

U.S. mining and mineral-processing industry

How to start and operate a mail-order antiques business

How to start and operate a mail-order antiques business

The New Hampshire manual of useful information

The New Hampshire manual of useful information

Golden Age of Radio

Golden Age of Radio

The 2000 Import and Export Market for Meat and Fish Flours and Meals Not Fit for Human Consumption in The Middle East (World Trade Report)

The 2000 Import and Export Market for Meat and Fish Flours and Meals Not Fit for Human Consumption in The Middle East (World Trade Report)

Middle East economies

Middle East economies

naked Buddha

naked Buddha

High Modulus Fiber Composites in Ground Transportation and High Volume Applications Astm Special Technical Publication 873)

High Modulus Fiber Composites in Ground Transportation and High Volume Applications Astm Special Technical Publication 873)

Kate Bush

Kate Bush

Red for danger

Red for danger

The development of English humor.

The development of English humor.

Clearance and settlement systems status reports

Clearance and settlement systems status reports

Final report of research on wastewater reclamation at Whittier Narrows by Francis Clay McMichael Download PDF EPUB FB2

Originally published in by W.M. Keck Laboratory of Environmental Health Engineering, California Institute of Technology, Pasadena, under title: Final report of research on wastewater reclamation of Whittier Narrows.

with the Final Report of Research on Wastewater Reclamation at Whittier Narrows. A summary of these investigations and their conclusions is presented at the front of the report, followed by brief recommendations.

The body of the report contains detailed descriptions and explanations, tabulations, and figures to make the pre sentation as.

We would like to show you a description here but the site won’t allow more. Artificial recharge programs began in Whittier Narrows, near Los Angeles, California (see Box ), in the early s using surface percolation of blends of captured storm water, imported water, and treated wastewater in unlined river channels or specially constructed spreading basins.

Final report of research on wastewater reclamation at Whittier Narrows. Publication No. 33, State of California Water Quality Control Board, Sept., Merrell, J. C., Jr., A. Katko, and H. Pintler (). The Santee Recreation Project, Santee California, final report. Water Pollution Control Research Series Publication No.

WPCited by: 2. Wastewater reclamation research and development System A: Coagulation, Sedimentation, Filtration and Disinfection ALUM mg/l AMONIC POLYMER mg/l FLOCCULATION 1 hr SEDIMENTATION 33 m/d COMBMED Cl 2 RESIDUALS RI RAPID MIXING \r\ DUAL MEDIA CHLORINE 1 CHLORI CONTACT FILTRATION m/min L o t i CONTA 2hr IV I I 9 # i li a2 4Ar^.

McCarty, P.L. et al. (): Advanced Treatment for Wastewater Reclamation at Water Fact prepared for Municipal Environmental Research Laboratory, US Environmental Protection Agency, Cincinnati, Ohio, EPA/2–84–, January Google Scholar. The concentration of Fe ion in 17 water samples was within the limit of to mg L -1 (Table 2).

As per the detected level, this ion was within safe limit for irrigation because the. Other research is available under the Science and Technology Program (S&T) as well as Reclamation's list of available patent technologies.

Review Department of Interior and Bureau of Reclamation Policy. Download the DWPR Final Report Template. Published Reports (A through Z) If you have any questions about these documents, please contact: The Office of Public Affairs via email at: [email protected] or phone at: () NOTE: A scroll bar is availalbe at the bottom of each table when the screen size is small.

This banner text can have markup. web; books; video; audio; software; images; Toggle navigation. Request PDF | Evaluation of food processing wastewater loading characteristics on metal mobilization within the soil | Wastewater generated during food processing is commonly treated using land.

Whittier Narrows DSMS Final EIS Los Angeles County, California May iii did not fail. Dam failure as a result of malfunction is currently being addressed through an ongoing action. The Corps has an urgent need to act to reduce the likelihood and consequences of Dam failure resulting from potential Dam breach.

EPA//R/ September Manual Guidelines for Water Reuse U.S. Environmental Protection Agency Office of Water Office of Wastewater Enforcement and Compliance Washington, DC Office of Research and Development Office of Technology Transfer and Regulatory Support Center for Environmental Research Information Cincinnati, Ohio U.S.

Agency for International Development. Volume 2 (Basic principles of wastewater treatment) is also introductory, but at a higher level of detailing. The core of this book is the unit operations and processes associated with biological wastewater treatment.

The major topics cov-ered are: microbiology and ecology of wastewater. Report ID Year Report Title. File Size; DSO Evaluation of Numerical Models for Simulating Embankment Dam Erosion and Breach Processes: MB: DSO Scanning Sonar Technology Development: MB: DSO Determining Erosion Indices of Cohesive Soils with the Hole Erosion Test and Jet Erosion Test: MB: DSO.

InKaiser Steel Corporation began operating a waste water treaitment facility at its Fontana plant where More recently, the Whittier Narrows Water Reclamation and San Jose Creek Water Renovation Plants, both in the vicinity of Whittier Narrows, were constructed by the County Sanitation Districts of Los Angeles County to supply treated.

Wastewater Reclamation at Whittier Narrows. A report by the State Water Quality Control Board, State of California Pub. The general objective of this investigation was to determine the effects of intermittent percolation through soil of highly treated acti- vated-sludge effluent on the quality of ground water in the Whittier Narrows area.

For example, efforts to recycle water and pump it into the large San Gabriel Basin stretching north of Whittier Narrows to the foothills was stymied in.

This report assesses the health effects and safety of using reclaimed water as a sole source or as a component of the potable water supply. The report was prepared by the Committee to Evaluate the Viability of Augmenting Potable Water Supplies With Reclaimed Water, which was appointed by the National Research Council (NRC) to evaluate issues associated with potable reuse of municipal wastewater.

California legislation encourages wastewater reclamation and reuse in the State Water Code. A major groundwater recharge project by surface spreading is initiated at the Whittier Narrows spreading basin. Santee recreational lakes, supplied with reclaimed water, are .Treatment processes in wastewater reclamation are employed either singly or in combination to achieve reclaimed water quality goals.

Considering the key unit processes and operations commonly used in water reclamation (see Figure ), an almost endless number of treatment process flow diagrams can be developed to meet the water quality.Description: Update the LACDA Water Conservation and Supply Feasibility Study to provide specific recommendations to increase the maximum conservation pool elevation behind the dam from feet to feet.

Reference Number: P Implemented By: Los Angeles County Flood Control District Objective: Project will help local public agencies to meet long-term water supply needs.